Community Building Architectural Study
The SJRF engaged the services of IGW Architecture and Clark Dietz Engineering to complete a feasibility study on the costs and issues regarding the construction of the community building. This study design is a concept only design at this point. Its primary purpose is to outline construction cost estimates. Please see the DOCUMENTS section for a copy of the feasibility study.